PROJECTS

 

PROJECTS

 
During first months of activity the basic team was involved in diverse projects working on behalf of different clients. Our policy is to work with independent freelancers who can be mobilised and demobilised at any time, following the necessities of the project.

 

Client MOC Fabrication
Location Constanța
Services Concept, Basic Design, Detail Design

Client OMV Petrom
Location Black Sea Offshore assets/Constanța
Services Structural assessment of bridges with radiant heat shields, concept development for radiant heat shields installation, drains routing and construction drawings

Client WPE (Wind Power Energy) / STEAG
Location Crucea,Constanta, Romania, 2015
Services Installation of 2 X 120 m Lattice Wind Mast

Client Iberdrola
Location Mihai Viteazu/Constanta, Romania
Services Installation of 84 m and 105 m Lattice Wind Mast, preventive and corrective maintenance

Client Fuhrlander
Location Topolog, Tulcea, Romania
Services Installation of 2 x 70 m Tubular Wind Mast

Client WPE (Wind Power Energy)
Location Vaslui, Romania, 2009
Services Installation of 60 m Lattice Wind Mast

Client Gestamp
Location Various Location, Romania, 2009
Services Installation and maintenance of 80 m Lattice Wind Mast


Client WPD Romania (Western Power Distribution Group)
Location Gropeni/Braila, Romania, 2009
Services Installation of 103m Lattice Wind Mast

Client Enhol
Location  Various Location, Romania, 2009
Services Installation and maintenance of 60m and 70m Tubular Wind Mast

Client Gamesa
Location Various Locations, Romania, 2009 – 2014
Services Installation of 70m, 82m and 100m Lattice Wind

Mast, wind data management and wind data analysis, preventive and corrective maintenance


Client WPD Romania (Western Power Distribution Group)
Location Nicoresti/Galati, Romania, 2010
Services Installation of 105 m Lattice Wind Mast

Client WPE (Wind Power Energy)
Location Galati, Romania, 2010
Services Relocation 70 m Tubular Wind Mast, from Vaslui To Galati

Location Vulturu, Constanta Romania, 2010
ServicesInstallation of 105 m Lattice Wind Mast


Client WPE (Wind Power Energy)
Location Potoc, Romania, 2010
Services Delivery and installation of 80 m Lattice Wind Mast

Location  Toplet/Cornea Romania, 2010
Services Delivery and installation 2 x 60m Lattice Wind Mast

Location Ravenska, Romania, 2010
Services Delivery and installation of 40 m Lattice Wind Mast, 2010

Client EGP (Enel Green Power)
Location Romania, 2011 – 2013
Services Maintenance of 60m and 80m Tubular and Lattice Met Masts, de-install

Location Baraganu/Braila, Romania, 2011
Services Installation of 84 m Lattice Wind Mast

Location Radaseni, Romania, 2011
Services Installation of 105m Lattice Wind Mast


Client WPD Romania (Western Power Distribution Group)
Location Borca/Neamt, Romania, 2012
Services Preparation of the engineering design project documentation for erecting of Wind Measurement Mast. Installation of 60 m Heavy Duty Tubular Wind Mast and wind measuring equipment

Location Tudora, Romania, 2012
Services Installation of 105m Lattice Wind Mast and wind measuring equipment

Location Fruntiseni, Romania, 2012
Services Installation of 105m Lattice Wind Mast and wind measuring equipment


Location Bogdanesti, Romania, 2012
Services Relocation of 105m Lattice Wind Mast and wind monitoring equipment from Gropeni to Bogdanesti

Location Nicoresti, Romania, 2012
Services De-install 105m Lattice Wind Mast and wind measuring equipment

Client TUV Sud
Location Austria, 2015
Services Installation of 140 m Lattice Wind Mast

Client MOC Fabrication
Location Constanța
Services Concept, Basic Design, Detail Design

Client OMV Petrom
Location Black Sea Offshore assets/Constanța
Services Structural assessment of bridges with radiant heat shields, concept development for radiant heat shields installation, drains routing and construction drawings

Client Iberdrola
Location Mihai Viteazu/Constanta, Romania
Services Installation of 84 m and 105 m Lattice Wind Mast, preventive and corrective maintenance

Client Fuhrlander
Location Topolog, Tulcea, Romania
Services Installation of 2 x 70 m Tubular Wind Mast

Client WPE (Wind Power Energy)
Location Vaslui, Romania, 2009
Services Installation of 60 m Lattice Wind Mast

Client Gestamp
Location Various Location, Romania, 2009
Services Installation and maintenance of 80 m Lattice Wind Mast


Client WPD Romania (Western Power Distribution Group)
Location Gropeni/Braila, Romania, 2009
Services Installation of 103m Lattice Wind Mast

Client Enhol
Location  Various Location, Romania, 2009
Services Installation and maintenance of 60m and 70m Tubular Wind Mast

Client Gamesa
Location Various Locations, Romania, 2009 – 2014
Services Installation of 70m, 82m and 100m Lattice Wind Mast, wind data management and wind data analysis, preventive and corrective maintenance


Client WPD Romania (Western Power Distribution Group)
Location Nicoresti/Galati, Romania, 2010
Services Installation of 105 m Lattice Wind Mast

Client WPE (Wind Power Energy)
Location Galati, Romania, 2010
Services Relocation 70 m Tubular Wind Mast, from Vaslui To Galati

Location Vulturu, Constanta Romania, 2010
ServicesInstallation of 105 m Lattice Wind Mast


Client WPE (Wind Power Energy)
Location Potoc, Romania, 2010
Services Delivery and installation of 80 m Lattice Wind Mast

Location  Toplet/Cornea Romania, 2010
Services Delivery and installation 2 x 60m Lattice Wind Mast

Location Ravenska, Romania, 2010
Services Delivery and installation of 40 m Lattice Wind Mast, 2010

Client EGP (Enel Green Power)
Location Romania, 2011 – 2013
Services Maintenance of 60m and 80m Tubular and Lattice Met Masts, de-install

Location Baraganu/Braila, Romania, 2011
Services Installation of 84 m Lattice Wind Mast

Location Radaseni, Romania, 2011
Services Installation of 105m Lattice Wind Mast


Client WPD Romania (Western Power Distribution Group)
Location Borca/Neamt, Romania, 2012
Services Preparation of the engineering design project documentation for erecting of Wind Measurement Mast. Installation of 60 m Heavy Duty Tubular Wind Mast and wind measuring equipment

Location Tudora, Romania, 2012
Services Installation of 105m Lattice Wind Mast and wind measuring equipment

Location Fruntiseni, Romania, 2012
Services Installation of 105m Lattice Wind Mast and wind measuring equipment

Location Bogdanesti, Romania, 2012
Services Relocation of 105m Lattice Wind Mast and wind monitoring equipment from Gropeni to Bogdanesti

Location Nicoresti, Romania, 2012
Services De-install 105m Lattice Wind Mast and wind measuring equipment

Client TUV Sud
Location Austria, 2015
Services Installation of 140 m Lattice Wind Mast

Client WPE (Wind Power Energy) / STEAG
Location Crucea,Constanta, Romania, 2015
Services Installation of 2 X 120 m Lattice Wind Mast

SME Engineering

Address: 203 Mamaia Boulevard, Constanta, Romania, 900565
Phone:  +40 241 551 515
E-mail: office@sme-e.com

SME Engineering

Address: 203 Mamaia Boulevard, Constanta, Romania, 900565
Phone:  +40 241 551 515
E-mail: office@sme-e.com